je dunn construction master logo

Confidential Semiconductor Manufacturing Client

Bulk HCL Building

This project was an essential milestone for this confidential semiconductor client to meet production ramp targets. The project consisted of construction of a new building designed to house an 18K lb. hydrochloric acid gas trailer, all microelectronics grade purification systems, toxic gas monitoring systems, specialized scales, and fire protection systems. The project significantly enhanced safety by reducing technician exposure, while decreasing manufacturing tool downtime.

Location
Austin, TX
Client
Confidential
Completion Date
September 2022
5,000
Square Feet

Related Content

Projects
Advanced Industries
Portland
Confidential Semiconductor Manufacturing Client
Progressive Build Projects
Confidential
Hillsboro, OR
Projects
Advanced Industries
Santa Clara
Confidential Semiconductor Client
Integrated Construction Services
Confidential
Northern California
Projects
Healthcare
Austin
University Health System
Women's & Children's Tower & Parking Garage
University Health System
San Antonio, TX
Projects
Government
Austin
Texas Facilities Commission
Capitol Complex Master Plan
Texas Facilities Commission
Austin, Texas
Projects
Advanced Industries
Portland
Confidential Semiconductor Client
Fab Cleanroom Expansion & CUP Upgrades – Boise
Confidential
Boise, ID
Projects
Education
Austin
Bowie High School
Renovation and Modernization
Austin Independent School District
Austin, Texas
Projects
Multi-Family, Student Housing & Senior Living
Austin
Waterloo Tower Student Housing
2400 Seton
LV Collective
Austin, Texas
Projects
Aviation
Austin
Austin Bergstrom International Airport
Consolidated Maintenance Facility
City of Austin, Texas
Austin, Texas
Thought Leadership
Safety
Austin Dallas Houston
An Ally in Safety
James Robles
National Safety Director
April 2022
Thought Leadership
Design
Advanced Industries
Closing The Loop: Integrating Design & Construction In Semiconductor Manufacturing
Trent Wachsnicht
Market Leader
Advanced Industries
March 2022
Projects
Advanced Industries
Santa Clara
SLAC National Accelerator Laboratory
Various Projects
U.S. Department of Energy
Menlo Park, CA
Prefabrication & Manufacturing
Preconstruction
Case Study
Government
Austin
How a Customized VDC Approach Delivered Transformational Solutions at the Texas Facilities Commission Capitol Complex Project
Allison Smith
VDC Director
July 2021
Thought Leadership
Austin Dallas Houston
Building Cities, Rebuilding Careers in Construction: Lynn Terry
Lynn Terry
Project Director
March 2021
Thought Leadership
Advanced Industries
Prevention Through Design
Chris Hermreck
Vice President
January 2021
Thought Leadership
Advanced Industries
Offsite Manufacturing(OSM) Supports Semiconductor’s Fast-Paced Projects
Chris Hermreck
Vice President
December 2020
No data was found
No data was found