je dunn construction master logo

Confidential Semiconductor Client

Fab Cleanroom Expansion & CUP Upgrades – Boise

This project included the buildout of Fabrication Building 5, supporting subfab, interstitial upgrades and associated Central Plant Utility (CUP) Building 39. The existing Building 51 housed approximately 54,000 square feet of a fully functional R&D Cleanroom. The construction scope for this project involved the buildout of the remaining unfinished portion of the building which will enable an additional 54,000 square feet (approximate) of cleanroom for a total of 108,000 SF. Provisions were included to ensure there were no interruptions to production on the existing operating fab. The scope also included construction and buildout of the associated Central Utility Plant (CUP) Building 39 to serve Building 51.

Location
Boise, ID
Client
Confidential
Architect
Page
Completion Date
September 2022
54,000
Square Feet

Related Content

Projects
Advanced Industries Mission Critical
Santa Clara
Confidential Client Systems Upgrade & Expansion Progressive Build Program
Confidential Client
Fremont, CA
Projects
Advanced Industries
Portland
Confidential Semiconductor Manufacturing Client
Progressive Build Projects
Confidential
Hillsboro, OR
Projects
Advanced Industries Mission Critical
Santa Clara
Confidential Client Cleanroom
Confidential Client
Fremont, CA
Projects
Advanced Industries Mission Critical
Santa Clara
Confidential Client Data Center Project
Confidential Client
Santa Clara, CA
Thought Leadership
Advanced Industries
The CHIPS Act – Establishing a Contractor’s Role
Travis Noble
Vice President
Project Executive
August 2023
Projects
Advanced Industries Mission Critical
Santa Clara
SLAC National Accelerator Laboratory Bay Area Program
SLAC National Accelerator Laboratory
Menlo Park, CA
Projects
Advanced Industries
Austin
Confidential Semiconductor Manufacturing Client
Bulk HCL Building
Confidential
Austin, TX
Publication
Advanced Industries
The Look Ahead: Labor Shortage
August 2022
Thought Leadership
Design
Advanced Industries
Closing The Loop: Integrating Design & Construction In Semiconductor Manufacturing
Trent Wachsnicht
Chief Operating Officer
March 2022
Projects
Advanced Industries Mission Critical
Santa Clara
Confidential Industrial Manufacturing Company Conveyance Bridge
Confidential Industrial Manufacturing Company
Fremont, CA
No data was found
No data was found