je dunn construction master logo

Confidential Client Systems Upgrade & Expansion Progressive Build Program

JE Dunn is managing an ongoing progressive build work program at this confidential client's facility which began in 2019. This includes partnering with the client during the facility programming effort to provide design/build services to maximize value. Projects include chiller and cooling tower systems replacement and expansion, utility yard expansion, exhaust scrubber and platform replacement, makeup air unit replacement with new humidity control systems, spec-gas infrastructure upgrades, waste treatment/recycle systems, replacement of emergency generators, busduct extension, compressed dry air upgrades, and bulk gas upgrades within a 24/7 operating facility.

Location
Fremont, CA
Client
Confidential Client
Architect
SSOE Group / CAS Architects / Integrated Engineering Services / Martin/Martin Consulting Engineers / Innovative Project Solutions / Novate Solutions / WME Engineering

Related Content

Projects
Advanced Industries
Portland
Confidential Semiconductor Manufacturing Client
Progressive Build Projects
Confidential
Hillsboro, OR
Projects
Advanced Industries Mission Critical
Santa Clara
Confidential Client Cleanroom
Confidential Client
Fremont, CA
Projects
Advanced Industries Mission Critical
Santa Clara
Confidential Client Data Center Project
Confidential Client
Santa Clara, CA
Thought Leadership
Advanced Industries
The CHIPS Act – Establishing a Contractor’s Role
Travis Noble
Vice President
Project Executive
August 2023
Projects
Advanced Industries Mission Critical
Santa Clara
SLAC National Accelerator Laboratory Bay Area Program
SLAC National Accelerator Laboratory
Menlo Park, CA
Publication
Mission Critical
The Look Ahead: Consumer Spending, 2023 Outlook, and Mission Critical Spotlight
February 2023
Projects
Advanced Industries
Portland
Confidential Semiconductor Client
Fab Cleanroom Expansion & CUP Upgrades – Boise
Confidential
Boise, ID
Projects
Advanced Industries
Austin
Confidential Semiconductor Manufacturing Client
Bulk HCL Building
Confidential
Austin, TX
Publication
Advanced Industries
The Look Ahead: Labor Shortage
August 2022
Thought Leadership
Design
Advanced Industries
Closing The Loop: Integrating Design & Construction In Semiconductor Manufacturing
Trent Wachsnicht
Chief Operating Officer
March 2022
No data was found
No data was found