Confidential Semiconductor Manufacturing Client

Progressive Build Projects

JE Dunn has been active on this Confidential Semiconductor Manufacturing Client’s campus for the past eight years.

Our team has helped this client adopt a new Design-Build (DB) contracting strategy with some GMP, Lump Sum, D-B, CM/ GC, and shared savings compensation. This has created a collaborative environment geared towards improved cost and schedule certainty. We engage our design partner along with key Trade Partners during the programming phase which enables the team to challenge the client’s traditional/historic project delivery model used.

We continuously evaluate project risk through collaborative discussion as well as weekly project indicators that include cost, schedule, safety, quality, and closeout data. These indicators provide a snapshot of “project health” and enable the team to focus on areas of concern.

JE Dunn has constructed cleanrooms, extensive mechanical, and electrical support systems, including chilled water, process and house vacuum, process gases, ultra pure water, waste systems, telecom, power, air systems, and general and corrosive exhaust to support new cleanroom spaces and process tools.

Location
Hillsboro, OR
Client
Confidential
Architect
SSOE

Related Content

Projects
Advanced Industries
Santa Clara
Confidential Semiconductor Client
Integrated Construction Services
Confidential
Northern California
Projects
Advanced Industries
Portland
Confidential Semiconductor Client
Fab Cleanroom Expansion & CUP Upgrades – Boise
Confidential
Boise, ID
Projects
Advanced Industries
Austin
Confidential Semiconductor Manufacturing Client
Bulk HCL Building
Confidential
Austin, TX
Thought Leadership
Design
Advanced Industries
Closing The Loop: Integrating Design & Construction In Semiconductor Manufacturing
Trent Wachsnicht
Market Leader
Advanced Industries
March 2022
Projects
Advanced Industries
Santa Clara
SLAC National Accelerator Laboratory
Various Projects
U.S. Department of Energy
Menlo Park, CA
Thought Leadership
Advanced Industries
Prevention Through Design
Chris Hermreck
Vice President
January 2021
Thought Leadership
Advanced Industries
Offsite Manufacturing(OSM) Supports Semiconductor’s Fast-Paced Projects
Chris Hermreck
Vice President
December 2020
Projects
Advanced Industries
Portland
Confidential Semiconductor Manufacturing Client
Fab 8.1 S19 Basebuild
Confidential
Malta, New York
No data was found
No data was found