Quality Technology Services Metro

Quality Technology Services Metro

During the past decade, JE Dunn has completed 14 projects with QTS in Atlanta.

The QTS Metro Data Center is a 990,000 SF facility providing mission critical electrical, mechanical, and high capacity network systems. The building yields approximately 547,000 SF of data center space. The expansive facility is supported by 80MW of N+1 power capacity via an on-site Georgia Power substation and has 19 two-megawatt diesel generators with static UPS systems to provide over 20MW’s of usable backup power.

An expansion project completed by JE Dunn involved a 130,000 SF data floor expansion to an existing data center, coupled with a doubling of support systems including generators, chillers, and backup power systems. JE Dunn purchased the following equipment to install and commission in the existing data center:

• Generators {(16) 2.5MW 13.8kV Units}

• 2 sets of 15kV 1200A rated paralleling switchgear

We installed 125,000 SF of 48” tall raised access flooring ultimately built out to 200W/SF. In addition, we installed necessary MEP infrastructure so that addition of future equipment on the raised floor will have no impact to the data center reliability.