je dunn construction master logo

Hillyard Distribution Center

Hillyard, Inc. is a 100+-year-old chemical company. JE Dunn served as design-builder for a new, 141,000 SF, 20-dock position distribution center adjacent to Hillyard's headquarters in downtown St. Joseph, MO.

Site work was extensive, including nearly two months of remediation of unforeseen conditions following demolition of the existing structure on the site. The slab on grade is 10 inches thick, as Hillyard's average pallet weighs 2,800 pounds. Racking requirements and poor soils also drove this level of slab thickness.

The facility is comprised of 78 concrete tilt panels with two-inch insulated metal panels. 14,000 SF of the warehouse space is for class IC high flammability storage and includes a one-hour firewall, fire-rated doors, and spill containment barriers.

The space was designed with employee experience in mind, with the entire building being heated and air conditioned, along with clerestory windows to bring in natural light.

Location
Saint Joseph, MO
Client
Hillyard, Inc.
Architect
Davidson Architecture
Completion Date
April 2023
141,000
Square Feet
78
Tilt Panels
20
Dock Positions

Related Content

Projects
Industrial & Manufacturing
Houston
Valero Houston Refinery
Administration Buiding
Valero Energy Corporation
Houston, TX
Projects
Industrial & Manufacturing
Atlanta
YKK AP
Residential Window and Door Manufacturing Facility
YKK AP America
Macon, Georgia
Projects
Industrial & Manufacturing
Atlanta
NAPA Auto Parts
Balkamp Distribution Center Expansion
Genuine Parts Company
Plainfield, IN
Women in Construction Week
Campaigns
Industrial & Manufacturing
Houston
Valero Houston Refinery Administration Building
March 2023
Projects
Industrial & Manufacturing
Atlanta
Georgia-Pacific
Dixie Manufacturing Facility Expansion and Upgrades
Georgia-Pacific LLC
Darlington, South Carolina
Thought Leadership
Industrial & Manufacturing
Getting Ahead: The Benefits of Early Contractor Involvement in the Industrial Space
Drew Overmiller
Design Management Director
January 2022
Thought Leadership
Industrial & Manufacturing
Industrial Shift in a Post-Covid World
Brent Strength
Market Leader
Industrial & Manufacturing
November 2020
Case Study
Industrial & Manufacturing
Atlanta
COVID-19 Response Plan: Southeast Toyota Distribution and Manufacturing Expansion
Brent Strength
Market Leader
Industrial & Manufacturing
June 2020
Projects
Industrial & Manufacturing
Atlanta
Southeast Toyota Distributors
Vehicle Processing Center
Southeast Toyota Distributors
Commerce, Georgia
Projects
Industrial & Manufacturing
Kansas City
Kansas Dairy Ingredients
Processing Plant
Kansas Dairy Ingredients
Hugoton, Kansas
No data was found
No data was found