Delivering Together: The Value of Maximizing Collaboration in the Federal Space

In an evolving market where projects are large in scale and come with their own set of requirements, collaboration is crucial to finding success in the Federal space. Combining traditional methods, early involvement, and other technology tools, our Federal team is finding ways to take collaboration to another level for project success.

Integration of the complete team via collaborative delivery in all phases fosters transparency and improves results. In the Federal market, the delivery method is often dictated by the funding strategy. However, with projects increasing in complexity and size, maximizing collaboration mindset and culture combined with JE Dunnโ€™s collaboration tools and processes that have the most impact on project outcomes regardless of the delivery method.

COLLABORATION WITHIN TRADITIONAL METHODS
In the Federal space, a Best-Value procurement, where price and technical approach are important, but the design is complete, is a favored process due to funding profiles that fund programming and design well before the contractor is involved. While this delivery method works because of its established parameters, collaboration is even more important between team members to ensure the building can be constructed as specified, particularly when unique circumstances present themselvesโ€”as in the US Air Force Academy Cadet Chapel. โ€œThe restoration of the Chapel is unlike any project Iโ€™ve worked on, from a coordination standpoint,โ€ said Senior Project Manager Donny Tennyson. โ€œThough we utilized a traditional delivery method, this project presented opportunities for collaboration with the owner and our specialty trades. From the submission of certified pricing and a massive temporary enclosure, to coordinating specialty contractors due to the number of historic pieces; we needed a collaborative mindset to execute.โ€

EARLY INVOLVEMENT WITH DESIGN-BUILD
A delivery method gaining traction because of opportunities for early collaboration between the owner and the design-construction team is Design-Build. Integrating design and construction teams early in the process means constructability is considered con- currently with the ownerโ€™s design goals being developedโ€”saving valuable time on the front end while providing clients the most value. โ€œThe Design-Build delivery method streamlines the process by bringing design and construction expertise together on one team. Designers get the benefit of real-time cost estimating and constructability reviews during design, while the contractor has visibility to the importance of design decisions and can accelerate schedule with early packaging,โ€ said National Design Director Chris Migneron. โ€œAn effective Design-Build team should be able to work efficiently to save the owner time and money without sacrificing quality.โ€

UPPING COLLABORATION WITH IDBIO
While Design-Build relies on early collaboration, Integrated Design- Build Initial Outfitting (IDBIO) takes design-build to another level. IDBIO focuses on the end-state of a project and requires the highest level of collaboration between all parties. It is ideal for medical projects or facilities with complex furniture and equipment needs as all furniture, equipment, tools, and accessories can be planned for during design for a true turnkey client experience. This approach minimizes changes after construction because all the furnishing and equipment needs, like space requirements and utility needs, were considered during the design phase.

At the Tyndall AFB Medical Clinic, the JE Dunn team involved all design and construction team members as well as our trade partners in partnering sessions, charrettes, and pull planning. Throughout the process, Bluebeam Studio, BIM (Building Information Modeling), and BIM 360 Field helped the team visualize critical design and schedule issues. The IDBIO process, where furnishings and equipment were essential to the design, was the driving factor in JE Dunn being honored with an AGC Build America Award. And JE Dunn was just awarded the Ambulatory Care Center at Tyndall due to the collaboration at the Clinic.

After successfully completing 24 military clinics utilizing IDBIO delivery, JE Dunn self-performed the design of the Mountain Home Medical Centerโ€”a feat that we plan to do again on the $28M Tyndall Air Force Base Ambulatory Care Center in Florida, proving that collaboration tools that were previously reserved for larger work are also instrumental in smaller projects.

OTHER TOOLS OF THE TRADE
Collaboration begins with a commitment from all parties for transparency, but there are some additional tech tools that can enhance the process while fostering a team-first mindset. At the $305M Fort Leonard Wood Hospital project, JE Dunn and RLF performed 10 virtual reality modelsโ€”the first military project to utilize 3-D technologyโ€”for the stakeholders to digitally walk through the space before finalizing the design. Once the design was refined, the team provided eight physical mockups, so healthcare professionals could get a feel for the space and con- tribute to the final product.

Another first for the US Army Corps of Engineers at Fort Leonard Wood was the implementation of Collaborative Analytics. Through monthly surveys focused on communication, engagement, quality of work, innovation, organization, accountability, level of support, and team environment, the team continuously monitors stress and productivity and plots them on graphs to better identify trends. โ€œBy finding these pinch points as they arise, potential issues can be dealt with before they become a strain on efficiency and production,โ€ said Vice President Bob Latas.

Scheduled for completion in 2024, early indicators of Collaborative Analytics suggest it is a game changer when it comes to collaboration and transparency. โ€œA benefit of Collaborative Analytics is the ability to identify collaboration issues while there is still time to affect the outcome,โ€ said Kelly Miller, Program Manager, Kansas City District, Fort Leonard Wood Replacement Hospital project. โ€œThe attention being focused on collaboration and improving our partnership has resulted in a better understanding and appreciation of how our different perspectives lead to better outcomes and establish a high degree of trust between team members.โ€

COMMITMENT TO CONTINUOUS IMPROVEMENT
While finding ways to collaborateโ€”within traditional delivery methods or by incorporating new tools such as Collaborative Analyticsโ€” the commitment to applying lessons learned further enhances the process and fosters a team-first mindset critical to the success of large-scale projects.

Margaret Bowker
Senior Vice President

related headlines

Projects
Cultural & Entertainment Federal Historical Preservation
Colorado Springs Denver
United States Air Force Academy
Cadet Chapel Historic Restoration
US Air Force Civil Engineering Center
Colorado Springs, Colorado
Projects
Federal Healthcare
Kansas City
Fort Leonard Wood
Hospital Replacement
U.S. Army Corps of Engineers Kansas City District
Fort Leonard Wood, Missouri
Thought Leadership
Preconstruction
Cultural & Entertainment Federal Historical Preservation
Colorado Springs
Virtual Modeling Changes the Communication Game at the US Air Force Academy Cadet Chapel
Donny Tennyson
Vice President
August 2021
Thought Leadership
Preconstruction
Federal
Bringing Technology to Life: A Blended Approach to Enhance the Preconstruction Process
Tommy Turner
Senior Project Manager
July 2021
Case Study
Federal
850 Strong: A Look Inside a Team's Hurricane Resilience
Traci Clatterbuck
Marketing Director
October 2020
Projects
Cultural & Entertainment Federal Historical Preservation
Colorado Springs Denver
United States Air Force Academy
Cadet Chapel Historic Restoration
US Air Force Civil Engineering Center
Colorado Springs, Colorado
Projects
Federal Healthcare
Kansas City
Fort Leonard Wood
Hospital Replacement
U.S. Army Corps of Engineers Kansas City District
Fort Leonard Wood, Missouri
Thought Leadership
Preconstruction
Cultural & Entertainment Federal Historical Preservation
Colorado Springs
Virtual Modeling Changes the Communication Game at the US Air Force Academy Cadet Chapel
Donny Tennyson
Vice President
August 2021
Thought Leadership
Preconstruction
Federal
Bringing Technology to Life: A Blended Approach to Enhance the Preconstruction Process
Tommy Turner
Senior Project Manager
July 2021
Case Study
Federal
850 Strong: A Look Inside a Team's Hurricane Resilience
Traci Clatterbuck
Marketing Director
October 2020
Case Study
Federal Healthcare
Innovation In-Style for the Design on the New GLWACH
Tommy Turner
Senior Project Manager
October 2020
Projects
Corporate Environments Federal
Kansas City
Richard Bolling Federal Building
Phases I - IV Renovations
General Services Administration
Kansas City, Missouri
Projects
Federal Life Sciences & Research Mission Critical
Denver
National Renewable Energy Laboratory
Energy Systems Integration Facility
National Renewable Energy Laboratory
Golden, CO
Projects
Federal
Portland
Peace Arch Land Port of Entry
General Services Administration
Blaine, Washington
Projects
Federal Healthcare
Kansas City
U.S. Army Corps of Engineers
Medical MATOC Program
U.S. Army Corps of Engineers Little Rock District
Nationwide
Projects
Federal Justice
Portland
Pioneer Federal Courthouse
Seismic Upgrade Rehabilitation
General Services Administration
Portland, Oregon
Projects
Federal Government
Portland
GSA Wayne L. Morse U.S. Federal Courthouse
General Services Administration
Eugene, OR
Margaret Bowker
Senior Vice President
No data was found