je dunn construction master logo
Thought Leadership
Preconstruction
Education
Raleigh

Decision to Precision: A Targeted Lens Approach

School districts are often faced with difficult decisions that are not only time sensitive but also a matter of maximizing tax dollars with tight budgets. With ramifications far-reaching, the Wake County Public School System had a big decision to make for Stough Elementary School: demo the building and rebuild it, renovate and add to it, or renovate and add to it by changing the layout.

School district leaders leaned on the JE Dunn Charlotte team and Lensโ„ข platform to guide their decision using cost history and real-time design options, but what neither party realized was that the breadth of the technology and preconstruction knowledge would aid in decision-making as well save the project altogether.
At design kick-off, the team used one comยญponent of Lens to show the client the cost of each option. Using the vital cost history and flexibility provided by the platform to help with high-level estimatesโ€”but with full detail backupโ€”allowed the client to weigh each option to determine which was the best path forward. A targeted Lens approach allowed the team to price the project three different ways with real-time pricing and design implications. All three pricing options along with construcยญtability pros and cons were presented to the client and design team for discussion. After weighing each scenario, the district decided to move forward with the complete tear down and new construct option, as it proved it would provide the best value.

A Project in Jeopardy

As the design progressed into the Schematic Design (SD) phase and the program became more developed, it became apparent that the budget was in jeopardy. The SD estimate was over budget less than one week away from a โ€œGo / No-Goโ€ meeting with the school board, putting the entire project at risk. With the deadline looming, JE Dunn and the design team got to work figuring out how ย to reduce cost and still maintain the clientโ€™s required program.

Working side by side with designers from architecture, interiors, and planning firm LS3P, the team worked tirelessly over the next five days amending the design and construction approach to work toward the budget. LS3P would work on the model during the day and publish a revised model to JE Dunn in the afternoon or evening. JE Dunn would work through the night and into the morning utilizing Lens to integrate the architectโ€™s model with the estimate for Revit-based takeoff and Lens for detailed estimating to produce a revised estimate in less than 24 hours. We would evaluate the progress made and then get back to the drawing board again the same day. โ€œWorking in conjunction with JE Dunn, the design team was able to make quick edits to the Revit model so JE Dunn could then utilize the model to turn around accurate and detailed estimates. As opposed to 2-D takeoffs, Lens utilizes real building materials and components, in the Revit model, for a high degree of accuracy,โ€ said Mary Brehler, LS3P project manager. โ€œBy modeling several options, the program could quickly provide quantity comparisons on items such as material, buildings systems, and structural systems. This was critical to the budget and the schedule because it allowed the team to make early design decisions based on factual data and present it to the school systems for review.โ€

Refining the Estimate

After four iterations of Designer Revit update by day and JE Dunn estimate update by night, the goal was achieved prior to the clientโ€™s board meeting. โ€œWe basically had seven days to rework the estimate that would typically take two months,โ€ said JE Dunnโ€™s Preconstruction Services Director Mike Hughes. โ€œThe coordination between the teams and leveraging our technology not only drastically reduced the time to turn around a new estimate, but they also delivered an estimate and budget that was in line with the ownerโ€™s intent. The 30 years of data housed in Lens allows for educated decision-making and transparency, in turn fostering innovation and creating the accountability and trust that ultimately saved the project.โ€

Less than a year into preconstruction, the project was paused for 18 months due to the construction of other schools in the district and logistics of shifting students from each school. When preconstruction resumed, the budget stayed in line with hard-fought SD estimate through the completion of the project. The 100% Construction Design estiยญmate provided to the client by JE Dunn with minimal trade partner input ended up being within .5% of the final GMP (Guaranteed Maximum Price) that was based on โ€œrip and readโ€ publicly opened trade partner quotes.

In a construction climate that challenges teams to build faster while staying on budget, the accuracy and real-time information Lens provides is unmatched. Thanks to leveraging all Lens has to offer, Stough Elementary went from a project in jeopardy to completed in a shortened schedule with pinpoint accuracy in pricing. โ€œThe technology served as a great tool in the design process,โ€ said Brehler. โ€œAt the very early stages of schematic design, the program allowed us to quickly evaluate different building systems and materials for cost comparisons. The fact that Lens allowed the designer and CM to work in conjunction with each other by integrating with Revit was critical to the overall success of the estimate and, ultimately, the completed project.โ€

Brian Fromal
Senior Precon Estimating Manager

related headlines

Projects
Education
Charleston
Robert Smalls International Academy
Beaufort County School District
Beaufort, South Carolina
Case Study
Education
Denver
Colorado State University Spur Campus at the National Western Center
June 2023
In The News
Education
Kansas City
Alternate Career Pathways Shape the Future of Schools
Jeremy Baum
Vice President
Project Executive
June 2023
Projects
Education Multi-Family, Student Housing & Senior Living
Nashville
The Broadview at Vanderbilt
Graduate Student Housing
Balfour Beatty Campus Solutions/Vanderbilt University
Nashville, TN
Projects
Education Life Sciences & Research
Atlanta
Emory University Health Sciences
Research Building II
Emory University
Atlanta, GA
Projects
Education
Charleston
Robert Smalls International Academy
Beaufort County School District
Beaufort, South Carolina
Case Study
Education
Denver
Colorado State University Spur Campus at the National Western Center
June 2023
In The News
Education
Kansas City
Alternate Career Pathways Shape the Future of Schools
Jeremy Baum
Vice President
Project Executive
June 2023
Projects
Education Multi-Family, Student Housing & Senior Living
Nashville
The Broadview at Vanderbilt
Graduate Student Housing
Balfour Beatty Campus Solutions/Vanderbilt University
Nashville, TN
Projects
Education Life Sciences & Research
Atlanta
Emory University Health Sciences
Research Building II
Emory University
Atlanta, GA
In The News
Education Life Sciences & Research
Atlanta
JE Dunn Builds "Trailblazing Space" for Emory University
Christopher Rampton
Project Director
Ken Cornell
General Superintendent
Fred Tull
Vice President
February 2023
Projects
Education
Denver
Colorado State University Spur Campus
Multidisciplinary Higher Education Campus
Colorado State University
Denver, CO
Projects
Education
Austin
Bowie High School
Renovation and Modernization
Austin Independent School District
Austin, Texas
Projects
Education
Kansas City
Raymore-Peculiar School District
LEAD Center
Raymore-Peculiar School District
Peculiar, MO
Projects
Education
Kansas City
The Barstow School
Dan & Cassidy Towriss IDEA Space
The Barstow Schools
Leawood, Kansas
Projects
Education
Nashville
Sewanee University of the South
Centennial House Rennovation
Sewanee University of the South
Sewanee, TN
Projects
Education
Kansas City
Rockhurst University
Sedgwick Hall
Rockhurst University
Kansas City, Missouri
Projects
Cultural & Entertainment Education
Williston
Valley City State University
Center for the Arts
Valley City State University
Valley City, North Dakota
Projects
Education Life Sciences & Research
Minneapolis
University of Minnesota
Health Sciences Education Center
University of Minnesota
Minneapolis, Minnesota
Projects
Education Healthcare Life Sciences & Research Mission Critical
Denver
University of Colorado Anschutz Medical Campus
Anschutz Health Sciences Building
University of Colorado Anschutz Medical Campus
Aurora, Colorado
Brian Fromal
Senior Precon Estimating Manager
No data was found